A well-paved blacktop surface can last 20-45 years if properly maintained.  That is why periodic asphalt sealcoating is so important.  Asphalt sealcoats are surface treatments designed to seal and protect the asphalt pavement from harmful environmental conditions such as sunlight, rain, and snow.  A typical driveway should be sealcoated every two to three years, while commercial parking lots require more frequent treatment.  Call us today to see if it’s the right time to treat your paved surface.

Benefits of Sealcoating:

  • Cost effective, preserving asphalt for pennies per square foot
  • Improves appearance of asphalt
  • Easy to maintain
  • Acts as waterproofing agent and slows oxidation
  • Resists oil and spills
  • Protective against pressure washing
  • Increases pavement flexibility

Application Process Highlights

Note: Prior to pavement sealing, any structural failures or cracks on the pavement must be repaired. All potholes must be removed and replaced, cracks must be cleaned and filled, and oil spots cleaned or primed. The recommended air and pavement temperature should be at least 55 degrees Fahrenheit and rising during sealer application and for 8 hours afterward.

AXIS completely cleans the asphalt pavement with a sweeper truck and/or mechanical blowers and brooms to remove dirt and debris.

Material will be rubberized coal tar emulsion which exceeds Federal Specification RP355e.  On average, 50-60 square feet of asphalt will be covered per gallon of emulsion.   2-4 pounds of sand per gallon of emulsion added to increase the solids content while also creating less liability against slips and falls.  Acrylic-based hardening additive will be included in this formula for additional strength and longevity.

Sealcoating formula applied with precision using either a squeegee, spray, or a combination of both, depending on the conditions of the lot.

Post Application Instructions

Keep traffic off a newly sealed surface for a minimum of 18-36 hours to allow for drying (curing) time.  (Or sealcoating can be performed in sections to maximize convenience.)  Refrain from using sprinklers near the area, hosing down, or washing the area for 48 hours before and after work is completed.

Give Axis Global Enterprises a call today at: 757.857.4777 or fill out the form below to receive your FREE QUOTE!

Photo Gallery:

Testimonials:

“Axis striped and sealcoated our lot after hours so that operations were unaffected.  Service was extremely fast and reliable.  I highly recommend Axis.”
-Mike Standing, Owner, Waterman’s Surfside Grille

“Axis is a professional and reliable company that gets the job done on time and on budget.”
-S.B. Ballard, S.B. Ballard Construction Company

Contact Us:

Axis Global Enterprises
2824 Shipps Corner Road
Virginia Beach, VA 23453


Email: info@axisge.com
Phone: 757.857.4777
Fax: 757.857.1595